PROJECT STATUS 

2/12/21- Hi All , plans have been updated . Anna will schedule the next stage, if its possable, I would like to go over the plans at the office before we start documentation as i have few questions regarding cut levels we can go over it together on the PC and get next stage going in planning . .

Regards Steven

 

 

23/11/21 - Hi All, went through brief, Will amend plans and update the model to suit.

We are ready for next stage to Document these plans to GENERATE ELEVATIONS AND WINDOW SCHEDULES and start the planning process.

As long as the footprint remain the same changes and amendment internally can be made as the project evolves for the generator room.

Will let Anna Know

 

OLD BELOW

Hi Guys Refer to updated drawings . confirm if that works for you . relocated stairs but not sure if that works for you. as well I am useing VR refer to link of the model https://sketchfab.com/3d-models/proposed-extension-9047b285e15f4093aed59df4a03ea15e

RESPOND

MY BRIEF

If you want to add your brief as a PDF or Word Doc, File upload it here

Add File Here

TYPE YOUR BRIEF OR MESSAGE BELOW 

Continue the conversation and don't delete the last post, if you make an error refresh page before submitting.

Welcome to Archiscale , Start completing your brief.

ERROR---

ADD TODAYS DATE

ADD TODAYS DATE BEFORE SUBMITTING

Your content has been submitted

Start conversion here and press Submit to save

Hi Steve

 

Sorry we took time to get back to you, we've been shearing and slashing ready for summer.

We have changed the generator room yet again, as John has got correct dimensions for generator please see alterations on uploaded file.

Generator room needs to have room to work around generator, and ability to be able to be moved in and out if required therefore we have changed the access to either a sliding door or a roller door for ease of access. I know it's not aesthetically appealing but we need practical.

We have also changed the toilet area to incorporate a shower, again a sliding cavity door maybe the best option.

We have also made the window openings slightly smaller on the north east wall to allow for hanging space approx 780mm with window openings of 1650 approx.

On the interior house walls we have also eliminated the openings as again we wanted hanging or working space.

The stairs down to studio from kitchen are ok with stairs to be added to bottom landing to access garden., again that will be dependant on how much excavation we do.